Wastewater Management
|
Global

ZLD Facility Avoids Audit Penalty with Asset Infinity

Key Features:

This case study highlights how Asset Infinity helped a large Industrial ZLD facility avoid a regulatory audit penalty by centralizing PM, dosing, calibration, and effluent traceability into a unified, audit-ready system.

  • Standardized PM & Evidence Logging: Unified preventive maintenance workflows for evaporators, RO units, pumps, blowers, and dosing systems ensured complete traceability with photos, readings, and escalation for overdue tasks.
  • Digitized Dosing & Calibration Control: Chemical dosing entries with quantity, batch number, and before/after readings, combined with automated calibration tracking for pH, TDS, conductivity, and flow meters, ensured compliance with environmental norms.
  • Authentic Effluent & Compliance Visibility: Timestamped and geo-validated logs for pH, TDS, flow rate, and sample photos—combined with a centralized dashboard—enabled real-time anomaly detection and audit-ready documentation
Thank you! Your case study is ready

Click here to Download it now!
Oops! Something went wrong while submitting the form.

Related Case Studies

Asset risk management in the oil and gas industry
Global
Oil & Gas
Transforming Asset Risk Management Across Critical Energy Infrastructure with Asset Infinity

Simplify Assets & Equipment Tracking and Maintenance with Asset Infinity

Infizo Products & Bundles

schedule a Demo