Wastewater Management
|
Global

ZLD Facility Avoids Audit Penalty with Asset Infinity

Key Features:

This case study highlights how Asset Infinity helped a large Industrial ZLD facility avoid a regulatory audit penalty by centralizing PM, dosing, calibration, and effluent traceability into a unified, audit-ready system.

  • Standardized PM & Evidence Logging: Unified preventive maintenance workflows for evaporators, RO units, pumps, blowers, and dosing systems ensured complete traceability with photos, readings, and escalation for overdue tasks.
  • Digitized Dosing & Calibration Control: Chemical dosing entries with quantity, batch number, and before/after readings, combined with automated calibration tracking for pH, TDS, conductivity, and flow meters, ensured compliance with environmental norms.
  • Authentic Effluent & Compliance Visibility: Timestamped and geo-validated logs for pH, TDS, flow rate, and sample photos—combined with a centralized dashboard—enabled real-time anomaly detection and audit-ready documentation
Thank you! Your case study is ready

Click here to Download it now!
Oops! Something went wrong while submitting the form.

Related Case Studies

Simplify Assets & Equipment Tracking and Maintenance with Asset Infinity

Infizo Products & Bundles

schedule a Demo