Wind energy
|
Global

Wind IPP Cuts Turbine Faults by 23% with Asset Infinity

Key Features:

This case study highlights how Asset Infinity helped a multi-site Wind IPP achieve a 23% reduction in turbine faults by standardizing PM workflows, synchronizing alarms across farms, and strengthening RCA visibility.

  • Standardized Fleet-Wide PM Execution: Unified PM templates aligned with OEM guidelines ensured consistent servicing of nacelle, pitch, yaw, hydraulic, cooling, and electrical systems across all wind farms.
  • Centralized Alarm & Fault Intelligence: SCADA alarms and technician logs fed into a single dashboard, enabling pattern detection, repeated alarm identification, and cross-site comparison of failure trends.
  • Spare-Part & Component Traceability: Linking yaw motors, anemometers, pitch cards, and hydraulic components to individual faults revealed weak parts, incorrect repair practices, and recurring failure clusters.

Thank you! Your case study is ready

Click here to Download it now!
Oops! Something went wrong while submitting the form.

Related Case Studies

Usage tracking in aviation operations
Germany
Aviation
How an Aviation Company Improved Asset Utilization by 33% Across Operational Assets
Usage tracking in FMCG production operations
India
FMCG
How an FMCG Company Reduced Material Wastage by 27% Across Production Operations
Usage tracking in oil and gas operations
United Arab Emirates
Oil & Gas
How an Oil & Gas Company Improved Resource Utilization by 35% Across Field Operations

Simplify Assets & Equipment Tracking and Maintenance with Asset Infinity

schedule a Demo