Wastewater Management
|
Global

Treatment Plant Cuts Blower Failures by 27% with Asset Infinity

Key Features:

This case study highlights how Asset Infinity helped a major water & wastewater treatment plant cut blower failures by 27% in just four weeks through standardized PM, calibration traceability, and centralized equipment-health insights.

  • Standardized Blower PM & Evidence Recording: Unified PM checklists for belts, bearings, lubrication, vibration, temperature, and motor inspections ensured no maintenance steps were skipped, with overdue tasks escalated automatically.
  • Calibration Control for Critical Sensors: DO sensors, airflow meters, and pressure gauges tracked through a unified calibration calendar, with digital certificates and “Do Not Use” flags preventing inaccurate readings and delayed corrections.
  • Centralized Failure Logging & Health Monitoring: Detailed technician logs with photos, readings, and RCA notes—combined with dashboards showing runtime, vibration trends, and spare-consumption patterns—enabled early failure prediction and rapid issue resolution.

Thank you! Your case study is ready

Click here to Download it now!
Oops! Something went wrong while submitting the form.

Related Case Studies

Simplify Assets & Equipment Tracking and Maintenance with Asset Infinity

Infizo Products & Bundles

schedule a Demo