The client
The client is a large water and wastewater treatment plant serving an entire metropolitan region. It relies on blowers, aeration equipment, pumps, dissolved oxygen sensors, flow meters and clarifier mechanisms.
Blowers are the heart of the aeration process. They directly affect treatment quality, energy use and plant throughput, so a blower failure is felt across the plant.
The challenge
Repeated blower failures were disrupting treatment. Maintenance was missed or rushed, instruments drifted out of calibration, and nobody had a single record of what had failed and why.
- Blower motors, belts, bearings and couplings broke down often.
- Preventive maintenance was missed or rushed for lack of scheduling visibility.
- Lapsed calibration on sensors and gauges gave false readings and delayed corrections.
- Technician logs were inconsistent, often missing vibration or temperature readings.
- Root causes of repeat failures were hard to trace.
What they set up in Asset Infinity
The plant moved blower maintenance, instrument calibration and repair records into Asset Infinity, giving maintenance and instrumentation teams one record of each blower’s health.
Blower PM by runtime
Standard checklists cover belt tension, bearing lubrication, temperature and vibration, filters and motors. Plans trigger on runtime hours and manufacturer guidance, and overdue PM escalates. (Maintenance)
One calibration calendar
Dissolved oxygen sensors, flow meters, pressure gauges and air velocity sensors are on calibration plans, with certificates stored on each instrument and evidence captured in the mobile app. (Maintenance)
Repairs with root causes
Technicians log each breakdown with photos, readings, spare parts used and a root-cause note, so supervisors see repeat failures straight away. (Work)
Blower health dashboard
Runtime hours, failure frequency, overdue PM, temperature and vibration readings and spare consumption are shown by blower, with failures grouped by cause. (Insight)
How it works day to day
Here is how blower and instrument care runs at the plant now.
- System: raises PM on runtime. When a blower reaches its runtime threshold, a work order is created with the PM checklist attached.
- Technician: completes the blower checklist. In the mobile app, the technician checks belt tension, lubrication and filters, and enters temperature and vibration readings. Required fields cannot be skipped.
- Instrument technician: calibrates on schedule. Calibration work orders come due from the calendar. The technician records the result and attaches the certificate to the instrument.
- System: escalates anything overdue. PM or calibration that passes its due date triggers reminders and escalates to a supervisor.
- Technician: logs a breakdown with its cause. If a blower fails, the repair is logged with photos, readings, spares used and the root cause, such as belt wear or bearing failure.
- Supervisor: spots repeat failures. The supervisor sees repeat failures by blower and closes each job after review.
- Engineering team: targets the causes. Failures grouped by cause show where to act, and the team plans targeted corrections.
Before and after
| Before | With Asset Infinity | |
|---|---|---|
| Blower failures | Frequent breakdowns | 27% fewer in four weeks |
| Preventive maintenance | Missed or rushed | Runtime-based plans with escalation |
| Calibration | Lapses caused false readings | Zero missed calibrations |
| Technician logs | Missing vibration and temperature data | Required readings on every checklist |
| Root causes | Hard to trace | Recorded on each repair and grouped by cause |
| Equipment record | No unified history | One health record per blower |
How it rolled out
- All three teams included. The system was rolled out across the mechanical, electrical and instrumentation teams.
- Blower history migrated. All historical blower logs were migrated so root-cause analysis could build on past failures.
- No disruption to treatment. Field engineers were trained on mobile checklists and calibration, with no disruption to ongoing treatment.
The results
- 27% fewer blower failures
- 4 weeks to reach that reduction
- 0 missed calibrations
- Strong improvement in PM compliance and execution quality
- More stable aeration and dissolved oxygen levels, with predictable treatment output
- Fewer emergency repairs and less spare-part wastage
- Better coordination between maintenance and instrumentation teams
- Faster corrective planning from clear root-cause insight
Why it worked
Plans follow the machine
PM is triggered by runtime hours, so each blower is serviced according to how hard it has worked.
Calibration on one calendar
Every instrument is on a plan with escalation, so readings can be trusted and corrections come sooner.
Every failure has a cause
Recording the cause of each failure lets engineers fix what keeps breaking, which is why failures fell so fast.
Looking ahead
By putting blower PM on runtime-based plans, keeping every instrument on a calibration calendar and recording each repair with its cause, the plant cut blower failures by 27% in four weeks.
Stable aeration followed, and the same records now support longer blower life, steady treatment output and the plant’s regulatory obligations.