The client
The client is a large construction company headquartered in Dubai, building projects across several construction zones, with a central procurement team that buys materials for every site.
Sites need steel, blocks, formwork, pipes, cable and fittings delivered in time for each stage of work. A late delivery leaves a crew without material and pushes the program back.
The challenge
Site engineers sent material requisitions on paper forms and by message. Approvals waited on busy project managers, suppliers were chased by phone, and nobody could see which requisitions were stuck or which orders were late.
- Requisitions arrived incomplete or late, and some were lost.
- Project manager approvals held up purchases for days.
- Coordination with suppliers relied on phone calls and memory.
- Sites had no view of when material would arrive.
- Late materials disrupted project planning on site.
What they set up in Asset Infinity
The firm ran material purchasing through Asset Infinity’s Suppliers feature, with approval steps for each site and suppliers quoting against every requisition.
Site requisitions with a needed-by date
Site engineers raise requisitions from the mobile app or web, with the material, quantity, project and the date it is needed on site. (Suppliers)
Approval steps per site
Each site’s requisitions go to its project manager and then procurement, with reminders so approvals do not stall. (Platform)
Supplier quotes and orders
Procurement sends RFQs to approved suppliers, compares the quotes on the requisition and issues the purchase order with the delivery date. (Suppliers)
Receiving at the site
The site storekeeper records each delivery against the purchase order, noting part deliveries so the balance is followed up. (Suppliers)
How it works day to day
Here is how a site order for rebar reaches the slab on time.
- Site engineer: raises the requisition. Ahead of a slab pour, the site engineer requisitions rebar by size and quantity, with the project and the date it must be on site.
- Project manager: approves for the project. The project manager checks the quantity against the program and approves on the phone. A reminder arrives if it waits.
- Procurement buyer: collects supplier quotes. The buyer sends an RFQ to approved steel suppliers and records each price and delivery promise on the requisition.
- Procurement buyer: issues the purchase order. The best quote becomes a purchase order with the site address and delivery date, and the site sees it has been ordered.
- Site storekeeper: receives the delivery. The storekeeper records the delivery against the order. A part delivery leaves the balance open for follow-up.
- Procurement manager: watches what is late. A dashboard lists requisitions awaiting approval and orders past their delivery date, by site.
Before and after
| Before | With Asset Infinity | |
|---|---|---|
| Requisitions | Paper forms and messages | Raised in the app with a needed-by date |
| Approvals | Delayed by busy project managers | Approval steps with reminders |
| Suppliers | Chased by phone | Quotes and orders on the requisition |
| Site visibility | No view of when material would arrive | Order status and delivery date visible |
| Program | Disrupted by late materials | Material delays down 30% |
How it rolled out
- Procurement reviewed. The team examined how requisitions moved from site to supplier and where they waited.
- Purchasing configured. Past purchase records were moved in, with material categories, approval steps and site-wise workflows set up.
- Site and buying teams trained. Procurement staff, site engineers and storekeepers were trained in hands-on sessions.
The results
- 30% fewer material procurement delays
- Every requisition is visible from site to procurement to supplier.
- Material buying is planned against each site’s needs.
- Site teams and buyers work from the same requisition record.
- Less time spent chasing approvals and suppliers.
Why it worked
The date drives the order
A needed-by date on every requisition lets procurement act first on what the program needs soonest.
Approvals from site
Project managers approve on their phones between site walks, so their approvals no longer hold up orders.
Part deliveries followed up
Receiving against the order shows exactly what is still owed by each supplier.
Looking ahead
With every requisition carrying its needed-by date through approval, quoting, ordering and receiving, the firm reduced material procurement delays by 30% and kept crews supplied.
Supplier delivery records built up on each order also show which suppliers deliver on time, which helps the procurement team choose who to ask for the next quote.