Customer stories

Utilities & PowerUAE

A power utility made substation maintenance 35% more efficient across its service regions

How a Dubai power utility planned substation, transformer and generator maintenance by date and runtime in Asset Infinity, improving efficiency by 35%.

  • 35%better maintenance efficiency

The client

The client is a large utility headquartered in Dubai, with distribution infrastructure across several service regions and a central maintenance function.

Its network relies on substations, power transformers, ring main units, switchgear and standby generators. Servicing them means outages to plan, crews to send and access to arrange, so a missed visit is hard to make up.

The challenge

Service schedules were kept in spreadsheets per region, and history sat with whoever had done the last visit. Due dates slipped without anyone at head office seeing it.

  • Service timelines were missed, raising the risk of faults on the network.
  • Problems found in the field took too long to reach planners.
  • Each region scheduled differently, so workloads could not be compared.
  • The history of a transformer or switchboard was hard to piece together.

What they set up in Asset Infinity

The utility moved network maintenance into Asset Infinity, with each substation and its equipment in the register and service plans attached to the equipment they cover.

Plans by calendar and runtime

Switchgear and transformers are serviced on dates; standby generators on engine runtime. Each plan raises its work order when it falls due. (Maintenance)

Shutdowns and permits

Work that needs equipment isolated is grouped into a planned shutdown, and the permit is issued before the crew starts. (Maintenance)

Crews dispatched by region

Work orders go to the crew for that service region, with the substation, equipment and checklist on their phones. (Work)

Schedule compliance by region

Dashboards show work due, done and overdue by region and equipment class, so planners act before a visit is missed. (Insight)

How it works day to day

A planned visit to a substation now goes through these steps.

  1. Maintenance planner: attaches the plan. Each transformer, switchboard and generator has its service plan: on the calendar for most equipment, on runtime hours for generators.
  2. Generator technician: records runtime. Runtime hours from each standby generator are entered as meter readings, which move its next service closer as the hours build up.
  3. System: raises the work order. When a plan falls due, the work order is created for the right substation and region, with its checklist attached.
  4. Maintenance planner: plans the shutdown. Jobs that need isolation at the same substation are grouped into one planned shutdown to keep outages to a minimum.
  5. Crew supervisor: issues the permit. Before work begins, the permit to work is issued for the isolated equipment and recorded on the job.
  6. Field technician: completes the checklist. Readings, photos and a signature go into the checklist on the mobile app. A failed check raises corrective work.
  7. Regional manager: watches the schedule. Dashboards show overdue work by region and equipment class, so a slipping visit is rescheduled before it is missed.

Before and after

BeforeWith Asset Infinity
SchedulesSpreadsheets per regionPlans on each piece of equipment
GeneratorsServiced on guessworkServiced on runtime hours
OutagesPlanned job by jobGrouped into planned shutdowns
Field findingsSlow to reach plannersFailed checks raise corrective work
HistoryHeld by whoever did the last visitRecorded on the equipment
VisibilityNo view across regionsDue, done and overdue by region

How it rolled out

  1. Practices and records. Existing maintenance practices were reviewed, and legacy service records moved onto each piece of equipment.
  2. Plans set by region. Maintenance categories, schedule rules and region-wise workflows were configured for each service function.
  3. Crews trained. Maintenance and operations teams had hands-on sessions, followed by regular reviews and improvement recommendations.

The results

  • 35% better maintenance efficiency
  • Fewer missed service dates across the network
  • Service history held on each piece of equipment
  • Better planning of shutdowns and crew time
  • Faults found in the field reach planners as corrective work
  • More reliable service to customers through timely maintenance

Why it worked

Intervals that fit the equipment

Calendar plans suit switchgear; runtime plans suit generators. Both run side by side in one schedule.

Fewer outages for the same work

Grouping jobs into a planned shutdown means customers see one interruption instead of several.

Safety on the record

Permits and signed checklists sit on the work order, so each visit shows it was done safely and completely.

Looking ahead

With every substation’s equipment on a plan and every visit recorded against it, the utility’s planners can see the work ahead in each region and keep crews on schedule.

The service history now kept per transformer and switchboard is the basis for the next step: adjusting intervals to the equipment that needs more attention and less to the equipment that does not.