
The client
The client is a large local government council in North Africa responsible for more than $3.0 billion in community assets.
Its property portfolio includes public swimming pools, childcare centers, community centers, libraries, public toilets, shade structures and park amenities, each with its own equipment, supplies, utility bills and maintenance needs.
The challenge
The council had no central way to track, maintain and run a portfolio this varied. Costs rose in maintenance, stock, purchasing and utilities, and residents waited for answers.
- Poor asset tracking led to underused and mismanaged assets.
- No central system for scheduling and monitoring maintenance.
- Stock for many different facilities was hard to manage, and procurement led to budget overruns.
- Utility use across diverse assets was not managed well.
- No single helpdesk for community concerns and feedback.
What they set up in Asset Infinity
The council phased in Asset Infinity across its facilities, covering asset tracking, maintenance, stores, purchasing, utilities and a central request desk.
Assets tracked with RFID and barcodes
Every community asset is in one register and labeled with an RFID tag or barcode, so the council knows what it has, where it is and how it is used. (Assets)
Preventive maintenance with alerts
Facilities have preventive maintenance plans, and alerts tell teams when work is due, so repairs happen before small problems become costly ones. (Maintenance)
Utility use by facility
Utility meters, readings and bills are recorded for each facility, so the council can compare consumption and cost across sites and find savings. (Energy)
One desk for community issues
Community queries and issues are logged as requests, assigned to the right team and tracked until they are resolved. (Work)
How it works day to day
Here is how the council runs its community facilities today.
- Council staff: log a community issue. A resident’s complaint about a broken shade structure or a pool fault is logged as a request from the web, email or by scanning the asset’s label.
- System: routes it to the right team. The request becomes a work order for the responsible team, who are notified, and its status is visible until it is closed.
- System: raises preventive maintenance. Preventive plans create work orders when facilities and equipment are due for servicing, and alert the teams responsible.
- Storekeeper: keeps supplies stocked. Supplies for each facility are issued from the stores. Reorder alerts show what to buy before it runs out.
- Procurement officer: buys within budget. Purchase requests are approved, turned into purchase orders with approved vendors and received against the order, with spend visible against budget.
- Facility manager: records utility readings. Meter readings and utility bills are entered for each facility, building a record of consumption and cost over time.
- Asset manager: reviews use and cost. Dashboards show asset use, maintenance cost and utility spend by facility, pointing to what to fix, reassign or save on next.
Before and after
| Before | With Asset Infinity | |
|---|---|---|
| Asset tracking | Inefficient, leading to underuse | RFID and barcode tracking in one register |
| Maintenance | No central schedule or monitoring | Preventive plans with automated alerts |
| Stock | Hard to manage across facilities | Tracked stock with reorder alerts |
| Procurement | Budget overruns | Purchasing tied to budget and vendor control |
| Utilities | Not managed across assets | Consumption monitored by facility |
| Community concerns | No single helpdesk | One desk with tracked requests |
How it rolled out
- Staff trained. Initial training and setup prepared council staff for the new way of working.
- Piloted at select facilities. The system was tested at a small set of facilities before the full rollout.
- Features phased in. Each area was connected to existing systems one at a time over six months.
The results
- 25% increase in asset utilization efficiency
- 15% lower maintenance costs
- 20% lower utility expenses
- 10% lower inventory costs through better stock management
- ~5% of the annual budget saved through better procurement
- Higher community satisfaction from quicker, more effective responses to issues raised.
- Better budget control and vendor management in purchasing.
Why it worked
One system for every facility
Pools, libraries and parks are managed the same way, so the council compares cost and use across its whole portfolio.
Piloted before scaling
Testing at select facilities let staff learn the system and fix problems before the full rollout.
Savings in every area
Maintenance, stock, purchasing and utilities each produced measurable savings because each was finally tracked.
Looking ahead
By running its assets, maintenance, stock, purchasing and utilities in one system, the council made significant savings while improving the service residents receive.
For a public body managing more than $3.0 billion in community assets, a phased rollout with a pilot first kept risk low and showed results facility by facility.




